Facebook
Twitter
GPlus
Instagram
E-PORTFOLIO
HOME
ABOUT ME
SEMESTER 1
DESIGN STUDIO I
CULTURE N HISTORY I
DESIGN COMMUNICATION
BUILDING MATERIALS
SEMESTER 2
DESIGN STUDIO II
CULTURE N HISTORY II
BUILDING CONSTRUCTION I
ENVIRONMENTAL SUSTAINABLE DESIGN
SEMESTER 2.5
MEASURED DRAWINGS
WIP
WIP
SEMESTER 3
BUILDING SCIENCE I
SEMESTER 4
SEMESTER 5
SEMESTER 6
skip to main
|
skip to sidebar
Project 2A: Introduction to Site Analysis + Observation Deck
—
by
Nicky C.
on
0 comment
In a group, we are required to conduct site analysis of the physical context within the overall site. Use the following references as a f...
Project 2B: Retreat House
—
by
Nicky C.
on
0 comment
As a group we had visited the site, Cape Rachado, Port Dickson and finished the site investigation & 'nature scanning' to i...
Project 1: Research Time-line Analysis
—
by
Nicky C.
on
0 comment
This research project adopts document analysis methodology that involves documenting, analyzing, producing, and presenting orally a criti...
Project 2: Web Book Report
—
by
Nicky C.
on
0 comment
In a group of 5, we are required to conduct a research and architectural analysis on a selected building. The report should be written do...
Project: Green-Go 2015 Short Environment Design
—
by
Nicky C.
on
0 comment
Environmental issues have become a great concern for mankind at present time as these issues are affecting and will affect earth and us b...
Project 1: Experiencing Construction
—
by
Nicky C.
on
0 comment
The design process is ongoing from conceptual design stage right through to construction. The preparation of construction drawing plays a...
Project 2: Construction Details and Specifications
—
by
Nicky C.
on
0 comment
This project is a continuation of the first project - an integrated project where it involves construction detailing solution for Project...
Subscribe to:
Posts (Atom)
Newer Posts
Older Posts
Blog Archive
▼
2016
(11)
▼
July
(7)
Project 1: Journey of the 5 Senses
Project 2: Genius LociL: Site Analysis & Concept D...
Project 3: Genius Loci: Visitor Interpretive Centre
Project 3: Computer Applications Animation
Project 1: Skeletal Construction
Project 2: Understanding Forces in Building Constr...
Project 1: Case Study: Proposing Passive building ...
►
June
(2)
►
April
(1)
►
March
(1)
►
2015
(24)
►
December
(8)
►
July
(16)
Powered by
Blogger
.